Quality Hyundai
Design through Installation
Viking Equipment prepared a CAD drawing to layout this shop. Full shop installation included lifts, Hunter alignment, exhaust, fresh oil, air compression, parts room and more.
The layout was particularly challenging. the building was repourposed from an old post office distribution center. We worked closely with the architect, General contractor and with Joe Blichfeldt the owner to achieve a great result.